Illustrative image – not actual.
RVNL- SCPL (JV) has emerged as the lowest bidder (L1) for a project from Eastern Railway.
The project cost is Rs 837.67 crore covers the construction of minor bridges, major bridges, RUB, ROB, retaining wall, level crossing, side drain, catch water drain, P.way work and other ancillary works between Kalipahari (inc.) to Pradhankhuta (exc.) in connection with construction of multi-tracking Railway BG line.
In the JV, RVNL as Lead Member has 74 percent, and SCPL has 26 percent.
