Illustrative image – not actual.
Rail Vikas Nigam has invited bids for a rail-cum-road bridge project in the state of Uttar Pradesh.
The scope of work includes construction of substructure, superstructure and river training/protection work for the rail-cum-road bridge over Ganga river between Gazipur and Tarighat in connection with construction of a new BG line from Mau to Tarighat in the state of Uttar Pradesh.
The estimated cost of the project is Rs 446.6 crore. The project is scheduled to be completed in 36 months.
