Illustrative image – not actual.A Rail Vikas Nigam (RVNL) high level team of officials reached China on 24 November 2014, and is in talks with the country's High Speed Rail Corp to build the Delhi-Chennai bullet train corridor.
The team will chalk out plans for conducting a feasibility study to build the 1,754 km long Delhi-Chennai high speed train corridor. The line is estimated to cost around US$ 32.6 billion.
The proposed corridor could be the second largest in the world after China's 2,298 km long Beijing-Guangzhou line which was launched last year. It covers the distance in about eight hours, at a speed of 300 kmph.
India is presently considering two corridors for high speed trains. While Japan is conducting a feasibility study for the Bullet train project on the Mumbai-Ahmedabad corridor, China will do the same for the Delhi-Chennai route which is expected to begin by early next year. The detailed study report of Japan International Cooperation Agency (JICA) on the Mumbai-Ahmedabad corridor is scheduled to be submitted in May 2015.
The Delhi-Chennai route is part of the proposed Diamond Quadrilateral project, which aims to build a high speed train network between different cities, including Delhi-Mumbai, Mumbai-Chennai, Chennai-Kolkata, Kolkata-Delhi and Mumbai-Kolkata.
