Runway opens for trial runs at Delhi international airportIllustrative image – not actual.

On 21 August 2008, Delhi International Airport started trial runs of the 4,430 mtrs third runway, with the landing of an Air India Boeing 777-300 (extended range). The aircraft, with the pilot and cabin crew on board the inaugural flight, first performed a low flypast without landing and returned 10 minutes later.

The new runway will have advanced instrument landing system, which allows aircraft to land in visibility as low as 50 mtrs. DIAL upgraded several new aircraft parking stands to meet this standard. The runway is expected to nearly double the airport's peak hour capacity from 35-40 aircraft movements currently to about 75. Currently, the two existing parallel runways handle nearly 700 flights a day.

The runway will be equipped with a new CAT 2 B instrument landing system to facilitate landing during poor visibility. This runway can also handle big aircrafts like the Airbus A380 and also the Antonov AN-225. The runway, costing about Rs.1,000 crore, has a surface glass grid laid under the concrete to prevent cracks.

Also See:

Trial runs at Delhi airport's new runway from 21 August (12-Aug-08)

← All latest storiesBack to top →