Illustrative image – not actual.Ruchi Soya has signed an MoU with Thermax to set up 1 MW fluidised bed biomass gasification plant in Maharashtra.
The 1 MW fluidized bed biomass gasification plant will be set up by Ruchi Soya at its Washim unit in the state. It will act as a Model Investment Project. The plant will be executed by Thermax on the technology acquired from the Energy Research Centre and Dahlman, Netherlands. The proposed gasification system will have higher conversion efficiency (more than 95 per cent) as compared to 80-85 per cent of the existing gasification systems. An advanced gas cleanup system will overcome the existing barriers such as non availability of proven single module of gasifier and gas clean up unit of capacity one MW or above. It will generate operating data required for standardization and act as input for determination of separate tariff and demonstration of tri–generation. This plant will also help in demonstrating biomass gasification technology for generation of grid quality power.
