Rs 5,200-cr Tanakpur–Lipulekh road via Pithoragarh to be completed within a yearIllustrative image – not actual.

Union Minister for Road Transport and Highways Nitin Gadkari has assured that the Tanakpur–Lipulekh road via Pithoragarh will be completed within the next year.

The Rs 5,200 crore strategic highway project is aimed at improving connectivity in Uttarakhand’s border regions and strengthening infrastructure in the Himalayan terrain. Speaking at a public event in Dehradun, Minister Gadkari stated , “ A road is being built from Tanakpur to Lipulekh via Pithoragarh at a cost of Rs 5200 crore. Of the 370 kilometres, approximately 200 kilometres have been completed, and the remaining 129 kilometres face significant obstacles. Despite this, we will strive to complete it within the next year."

The road is expected to significantly enhance mobility, defence logistics, and regional connectivity in the border areas. The project is part of broader efforts to improve infrastructure in Uttarakhand’s difficult terrain, ensuring year-round accessibility to remote regions. The event also highlighted the inauguration of the six-lane Delhi–Dehradun Economic Corridor, a 213-kilometre access-controlled highway developed at a cost of over Rs 12,000 crore. The corridor is expected to drastically reduce travel time between Delhi and Dehradun from over six hours to around two and a half hours, boosting tourism, trade, and regional economic growth.

← All latest storiesBack to top →