Illustrative image – not actual.Mayor M Anbazhagan, on 13 May, 2026 inspected the construction of a state-of-the-art sewage treatment plant (STP) at Panjapur in Tiruchi, urging officials to expedite remaining works.
Funded under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0 at an estimated cost of Rs 233.87 crore, the facility is strategically located along the Tiruchi–Madurai National Highway. The project is designed to future-proof the city’s sanitation needs, replacing an older 58.64 MLD waste stabilization pond system with advanced technology. The new plant will boast a treatment capacity of 100 million litres per day (MLD), serving 50 municipal wards. Unlike the existing land-intensive facility, this modern STP utilizes Sequencing Batch Reactor (SBR) technology, which ensures higher efficiency, superior treatment quality, and prevents soil seepage. This technological shift is critical for managing the sewage volume generated by Tiruchi’s growing population. Since construction began in March 2024, the project has achieved 74 percent completion.
With the civil body targeting a June 2026 deadline, the facility is poised to significantly enhance the city’s environmental standards and public health infrastructure. Once operational, it will represent a major milestone in Tiruchi’s journey toward sustainable urban water management.
