Illustrative image – not actual.The Rourkela Steel Plant is likely to complete the upgradation of its electric resistance welded (ERW) pipe project, by Decembr 2003. The project was earlier scheduled to be completed by November 2003.
The plant, which would be upgraded at a cost of Rs.89.15 crore, would enable a production of 75,000 tonnes of high-grade pipes, which would conform to the guidelines laid down by the American Petroleum Institute.
It may be noticed that ERW pipes are used for oil transportation, sewage disposal and for sinking tube wells.
