Illustrative image – not actual.Border Roads Organisation has opened the Roing-Hunli-Anini road in Arunachal Pradesh, for traffic.
After five years the organisation has revamped the landslide-prone 230 km Roing-Hunli-Anini road, particularly the nine km long Andolin bypass. However, due to the terrain and altitude, the Roing-Hunli-Anini road still remains cut off from the rest of the state during monsoons. To tackle the issue, the 62 RCC is permanently based at Hunli, nine km from Roing, to monitor and repair the road whenever required.
The road faces the usual challenges that include the frequent change of course of the river Deopani during the rains, mudslides and landslides on the 81.6 km road between Roing and Hunli, and the 81.1 km Hunli-Anini road during the monsoons.
The double lane road project was proposed to connect Anini in Dibang Valley district, with all-weather roads. Once it gets commissioned, the diversion from the 16 km point on the Roing-Hunli road, known as Greenfield alignment, will run along the bank of the Dibang river and join the Hunli-Anini road at the 21.5 km point.
