Roads linking Yamuna Expressway with Noida airport may be ready by April, 2024Illustrative image – not actual.

A 700 mtrs. stretch linking the Yamuna Expressway with the Noida airport and a 31-km road connecting the speedway with the Delhi-Mumbai Expressway near Ballabhgarh are expected to be ready in April, 2024.

The NCR Transport Corporation (NCRTC) is also planning to ready a DPR for a project to build a 72-km rapid rail network between Ghaziabad station and the airport. The UP Roadways will prepare a report on running bus services to nearby areas once commercial flights start by the end of this year.

A meeting between stakeholders on 09 February, 2024 covered every possible mode of transport with representatives of the National Highways Authority of India (NHAI), NCRTC and UP Roadways. Noida International Airport (NIAL) is the agency to monitor the airport project.

Another 750 mtrs. road will branch out of the speedway for VIPs to reach the airport, and land is being acquired for this. NIAL is in talks with UP Roadways to run buses from the airport to Delhi, Noida, Ghaziabad and Bulandshahr, Aligarh, Meerut, and Saharanpur. A depot is being planned in Sector-33, from where 80 buses are likely to operate in the initial stage. A soil test is underway for a 72-km corridor from Ghaziabad station to the Noida airport.

The Northern Central Railway will build a corridor to integrate the airport with the Delhi-Howrah and Delhi-Mumbai routes on either side. 

← All latest storiesBack to top →