Illustrative image – not actual.The BD25 million ($66.3 million) infrastructure project in Bahrain is expected be fully up and running in August 2013, instead of November 2013 as was stipulated in the contract.
The project consists of the construction of a three-level underpass from the Shaikh Isa bin Salman bridge leading to Hidd in both directions - via the Shaikh Khalifa bin Salman Causeway. There will also be a flyover with two lanes for traffic coming from Shaikh Isa bin Salman Highway and heading to the north towards Al Fateh Highway. The grade separated interchange will be controlled by signals that will direct traffic from and to Mina Salman Industrial Area through Avenue 42, Al Fateh Highway and Shaikh Isa bin Salman Highway.
