RITES invites bids for Raghunathpur power plant Illustrative image – not actual.

RITES has invited bids for construction of railway infrastructure to serve Raghunathpur Thermal Power Station at Raghunathpur, in Purulia district of West Bengal.

 

Bids have been invited for earthwork in formation including blanketing, construction of bridges, permanent way linking works including supply of permanent way fittings and track ballast for the project.

 

The estimated cost of the project is Rs 87.89 crore and is expected to be completed in 24 months.

 

The Raghunathpur coal-based power project involves setting up of the power plant in two stages. Stage-I of the project involves setting up of two units of the 600 MW (1,200 MW) power plant, at a cost of Rs 6,745 crore. Stage-II involves setting up of a coal-based power unit with a capacity of 1,200 MW (2 x 500+20%) MW.

 