Illustrative image – not actual.RITES has invited bids for work related to two bridge-over-river projects in Manipur.
Bids have been invited for topographic survey for feasibility study and cost estimation including sub-soil investigation of:
|
|
|
The approximate length of the area to be surveyed from C L of the existing bridge across river Barak is 0.85 km and 0.85 km towards U/s & D/s of the river respectively. The extent of land to be surveyed in the other direction is 100 mtr beyond the top of high banks of the river and 50 mtr beyond the hillside edge of NH-53, whichever is more.
Related Link:
Tender
