Illustrative image – not actual.The Rishikesh–Karnaprayag broad-gauge rail project in Uttarakhand has achieved a major engineering milestone with Tunnel Number 8, officially becoming the longest railway tunnel in India.
Spanning around 14.58 km between Devprayag and Janasu the tunnel is a crucial component of the 125-km rail line, which is expected to significantly improve connectivity in the Himalayan region and serve as a key transport link for the Char Dham pilgrimage circuit.
The project has been designed using advanced tunnelling technologies, combining Tunnel Boring Machines (TBMs) for efficient excavation in stable geological sections and the New Austrian Tunnelling Method (NATM) for more complex and fragile mountain terrain. This hybrid approach has enabled safer and more efficient construction in challenging Himalayan conditions.
The tunnel incorporates modern safety and operational systems, including double-line railway tracks, advanced drainage infrastructure, ventilation shafts, and emergency escape passages to ensure passenger safety in extreme conditions. Due to the sensitive ecology of the region, approx. 83 percent of the entire rail alignment is being constructed underground to reduce environmental impact.
Scheduled for completion by 2028, the Rs 37,000 crore project will connect Garhwal with the rest of India, boosting regional mobility, tourism, and economic development.
