Illustrative image – not actual.Rio de Janeiro is planning to commence construction of the city’s metro Line 4 with Tunnel boring machine (TBM) Tatuzão.
Tatuzão is expected to create 15-18 feet of new tunnel between Ipanema and Barra de Tijuca every day. The TBM’s cutting head measures 11.5 metres across – the same height as a four-story building. The next stage of the TBM assembly will be carried out in a cavern next to the General Osório Station before it starts digging toward the Gávea district.
Source: Rail.com
