Illustrative image – not actual.Reliance Industries is planning to develop a $8 billion coal liquefaction project at Talcher in Angul district of Orissa.
The proposed project will have a capacity to generate 80,000 barrels of oil a day and will be linked to captive coal blocks with a production capacity of 30 million tpa.
RIL is in talks with the ministry of coal to allocate three open-cast blocks - the Bankhui coal block (500 million tpa), the Sakhigopal B block (600 million tpa) and the Alaknanda block (500 million tpa) - in Talcher coalfields of Mahanadi Coalfields with reserves of 1.6 billion tpa.
