Illustrative image – not actual.The Rewa Ultra Mega Solar (RUMSL) has invited proposals from interested consultants for setting up solar parks in the state of Madhya Pradesh.
The International Bank for Reconstruction and Development (IBRD) will provide technical assistance for the projects through the Indian Renewable Energy Development Agency (IREDA). RUMSL is a joint venture (JV) between the Solar Energy Corporation of India (SECI) and Madhya Pradesh Urja Vikas Nigam (MPUVNL).
The proposal is for six separate scopes of work. The first scope is the environment and social baseline survey to identify land for the proposed solar parks in Cluster 1 (Sagar, Damoh, and Chhattarpur), Cluster 2 (Morena), Cluster 3 (Ratlam, Neemuch, and Mandsaur), and Cluster 4 (Rewa and Satna). The last date for submission of this bid is 20 February 2020.
The second scope is to conduct a survey to identify land parcels for solar projects in ravine areas of Bhind, Morena, and Sheopur districts in Madhya Pradesh. The bids for these need to be submitted by 20 February 2020. The third scope is for installation, testing, commissioning and post-implementation handholding support of the central remote monitoring system of projects. The last date for submission of bids is 24 February 2020.
The bids for RUMSL’s business plan and capacity building should be submitted by 24 February 2020. The bids for media coverage, communication strategy, and its implementation need to be submitted by 17 February 2020.
In August 2019, RUMSL had issued a request for proposal for consultancy services for environment and social impact assessment (ESIA) of three solar parks in the state.
RUMSL is in the process of developing three solar parks with a combined capacity of 1,500 MW located in Agar, Shajapur, and Neemuch districts with individual capacities of 550 MW, 450 MW and 500 MW respectively. The districts are located in Madhya Pradesh, and the World Bank will finance the entire 1,500 MW capacity.
