Revised DPR for extension of Aqua Line corridor gets nodIllustrative image – not actual.

The Noida Metro Rail Corporation (NMRC) has given its nod to the revised detailed project report (DPR) for the extension of the Aqua Line corridor. It will cover 11 stations, starting from the existing one at Sector-51 in Noida to Knowledge Park-V in Greater Noida.

The DPR has been approved with slight changes in its alignment and will be sent for approval by the Uttar Pradesh Government and the Centre. The Delhi Metro Rail Corporation (DMRC) was entrusted with preparing the modified report. As per the report, the total completion cost of the project is estimated to be Rs 2,991.60 crore, covering a length of 17.43 km.

This project will provide ease of access to commuters in Noida, Greater Noida West and Greater Noida via Vikas Marg and Noida-Greater Noida Link Road. It will also serve to decongest heavy traffic along these roads.  The Noida Sector 61 station will serve as an interchange between the Aqua Line and DMRC’s Blue Line.

The proposed stations are: Noida Sector 61, Noida Sector 70, Noida Sector 122, Noida Sector 123, Greater Noida Sector 4, EcoTech 12, Greater Noida Sector 2, Greater Noida Sector 3, Greater Noida Sector 10, Greater Noida Sector 12 and Greater Noida Knowledge Park V.

In the earlier DPR, a foot overbridge was planned to connect Sector 51 (Aqua Line) and Sector 52 (Blue Line) stations, but NMRC sought changes, stating that the bridge would not be a permanent resolution owing to the 430-mtrs. distance between the two stations.

 

← All latest storiesBack to top →