Restored Sharavathi Generating Station openedIllustrative image – not actual.
Energy Minister of Karnataka, D K Shivakumar, on 2 March 2018 inaugurated the renovated Sharavathi Generating Station (SGS), a unit of Sharavathi Hydel Power Project.

It has an installed capacity to generate 1,469 MW.

The SGS has been revamped at an investment of Rs 64 crore. As part of the renovation, the work of automation of the power distribution system was taken up and the control room was rebuilt by adopting modern supervisory control and data acquisition technology (SCADA).

The renovation works was completed by the Karnataka Power Corporation in a span of 178 days.

← All latest storiesBack to top →