Illustrative image – not actual.Reliance Industries, on 1 November 2006, announced that it would invest $5.2 billion (Rs.23,293 crore) in doubling output from the Krishna-Godvari gas basin to 80 mmscmd. An amendment to the original plan envisaging 40 mmscmd has already been submitted to the Directorate General of Hydrocarbons for approval.
The D6 block has in-place reserves of 50 trillion cubic feet. Initial output, in July 2008, is pegged at 40 mmscmd, which will increase up to 50 mmscmd by December 2008, 60 mmscmd by March 2009 and 80 mmscmd by December 2009. The life of the field is around 15 years, and the yield will diminish after seven-eight years.
In April 2005, the government had approved Reliance's plan of investing $2.49 billion to produce 40 mmscmd for 7.5 years from the discoveries Dhirubhai-1 and Dhirubhai-3 in the D6 block, out of a total of 34 wells.
The revised plan follows an enhanced assessment of gas potential of 11.3 tcf in the D-1 and D-3 discoveries alone. DGH has estimated the total gas potential in the D6 block (officially known as KG-DWN-98/3) at 14 tcf, while Reliance Industries maintains that it is much more. Production from D6 is expected from the second half of 2008-09, i.e. October 2009 onwards.
The board of Reliance Industries is scheduled to meet on 9 November 2006 to consider the revised plan and discuss the means of financing. The company plans to raise $2 billion through a foreign currency convertible bond issue, which, incidentally, would be the largest ever by an Indian corporate entity.
Background: The deepwater block, covering 7,645 km, was awarded to Reliance Industries and Canada-based Niko Resources under the first round of NELP. Reliance is the operator of the block with 90 per cent interest. In November 2002, a huge gas discovery, then estimated at 14 tcf, was made.
India's total gas production in 2005-06 is estimated at 32.3 bcm in 2005-06, with ONGC accounting for over 70 per cent.
Also See:
