Illustrative image – not actual.Anticipating an increase in the production
of petroleum products from refineries in North-east India, PSU majors have
proposed to lay a 165 km pipeline to transport petroleum products from
Numaligarh in Assam, to Siliguri in West Bengal.
Bharat Petroleum Corporation, Oil
India Ltd and Numaligarh Refineries have proposed to construct this Rs.650
crore pipeline.
The feasibility study, already approved
by the boards of NRL and BPCL, is expected to be completed by September 2003 and
the pipeline construction in 24 months after the approval of the project. The
pipeline will help save Rs.150 crore in freight.
While the funding arrangements of
the project have not been announced. The enhanced availability of crude oil
from the Ravva field for refineries in the north-east has caused the need for a
pipeline. This is expected to increase throughput of all the refineries in the
region from this financial year.
Due to the low demand for petroleum
products in the region, 60-70 per cent of the north-east refineries' output is
transported to consumption centres beyond Siliguri. So far, the railways are
doing it. However, the Railways might
not be in a position to provide additional rakes in the event that transport
volume increases.
