Illustrative image – not actual.
The Rashtriya Chemicals and Fertilizers (RCF) has extended the last date for submission of tenders to 30 June, 2025 for the selection of an EPC contractor to revamp ammonia plant (Line-I and Line-II) for energy optimisation at RCF Thal in Raigarh district, Maharashtra. This marks the fourth extension, with the original deadline initially scheduled for 17 May, 2025.
RCF intends to implement the modifications in the existing ammonia plant as defined in the study report and other modifications with TOPSOE with a view to bringing down the specific energy consumption, with no increase in the production level of 1,930 MTPD of each Line-I and Line-II of the plant.
Engineers India has been appointed as the project management consultant (PMC) for the assignment.
