Illustrative image – not actual.Construction of the Ratanjanta Greenfield Expressway, part of Radial Road-1, has accelerated, particularly across sections where land handover has been completed.
The 41.5-km corridor will connect the Raviryala interchange on Hyderabad’s Outer Ring Road with Amanagallu on the proposed Regional Ring Road, providing a planned access route to Bharat Future City. The project is being developed as a six-lane, partially access-controlled road, with the Hyderabad Metropolitan Development Authority estimating an investment of Rs 4,621 crore. Bridge construction has begun where required along the alignment, and a 20-metre median reservation has also been incorporated for a potential future metro or railway line.
The expressway is expected to improve connectivity to Bharat Future City, stimulate development and support increased property activity along the corridor.
