Illustrative image – not actual.After shutting down the first blast furnace in March 2020, the company has shut down the second blast furnaces also recently. There is a lack of demand in the market and given the scenario it is imperative to scale down the production.
RINL which has an installed capacity of over 7.5 million tpa produced about 18,000 tonne of hot metal on a daily basis. There are three blast furnaces of 2.5 million tpa each at the plant. Keeping vital equipment like coke oven batteries, blast furnaces, among others, in running condition is very essential for steel plants.
