Illustrative image – not actual.Ramky Infrastructure bagged contracts for six projects in Andhra Pradesh, Orissa, Tripura and West Bengal of worth Rs 231.41 crore.
In Andhra Pradesh, the company has bagged two projects from Hyderabad Metropolitan Water Supply And Sewerage Board (HMWSSB) worth Rs 141. 33 crore. One contract worth Rs 3.07 crore has been bagged for HWSSB - PCC II - Manning, Operation & Maintenance (MOM) of 172 MLD capacity sewage treatment plant at Nagole along with O&M of 7-I&Ds and 5-Major cross drain nala along the Musi between Puranapul to Nagole for one year during 2012-13. The tenure of completion is 12 months. The another contract worth Rs 138.26 crore has been bagged for HWSSB - KDWSP- Phase III - Design, Construction, erection, testing and commissioning of water treatment plant of 410 MLD (90Mgd) at Kondandapur at Km 116/0 of Hyderabad - Nagarjunasagar State Highway including cost of all associated civil, mechanical, electrical and instrumentation items with electrically operated, PLC & SCADA, automation diffused aeration system, chemical houses, laboratory, 18 ML capacity raw water reservior including recycling arrangements of the wash water generated thereon etc., complete including miscellaneous works associated with the plant, with a warranty period of two years for all equipment and defect liability period of two years from the date of commissioning of the water treatment plant on turnkey basis including Manning and Operation for a period of two years under Krishna Drinking Water Supply Project Phase III - Package - V. The tenure of completion is 14 months.
Also, in Andhra Pradesh, Ramky Infrastructure has been awarded a project from Municipal Administration Department, Markapur for comprehensive water supply service improvements in Markapur Muncipality for a value of Rs 36.83 crore. The tenure of completion is 24 months.
In Orissa, Ramky Infrastructure has been awarded a project from Ramky Enviro Engineers worth Rs 11.01 crore. The scope of work includes civil works for construction of ETP at Hindalco site, Orissa. The tenure of completion is three months.
In West Bengal, Ramky Infrastructure has been awarded a project by IRCON International for finishing works for Indoor Stadium i.e. interior including flooring and seating arrangement, lift, acoustic, internal and external electrical, HVAC, water supply system, STP., misc.works etc. as per BOQ for new sports complex of Eastern Railway at Gholsapur (Behala), Kolkata for a value of Rs 26.71 crore. The tenure of completion is 8 months.
In Tripura, Ramky Infrastructure has been awarded a project from Government of Tripura for design, supply and construction of 14 Nos of over head service reservoir, other allied works in different locations of central zone and south zone of Agartala city.(Lot 1 and Lot 2)/contract package No.(AGT/WS09/ICB/11/7) for Lot 1 for a value of Rs 15.52 crore. The tenure of completion is 18 months.
