Railways to review routes for Dedicated Freight CorridorIllustrative image – not actual.

The Railway Ministry is planning to review of routes for the Dedicated Freight Corridor Project.

According to the feasibility report on the proposed first phase of the Delhi-Mumbai and Delhi-Kolkata route, as many as 78 constructions need to be removed for laying the dedicated lines. The Dedicated Freight Corridor Corporation of India (DFCCIL), set up for implementing the freight corridor project, has got inputs from the RITES about the existing flyovers, overbridges and railway stations that are to be removed for laying the dedicated tracks.

The high density network connecting the four metros - Chennai, Delhi, Kolkata and Mumbai - known as Golden Quadrilateral, has also got saturated at most locations. While the 1,483-km Delhi-Mumbai corridor, also known as Western corridor, will be built at a cost of Rs.16,580 crore, the 1,280 km Delhi-Kolkata Eastern corridor will cost about Rs.11,450 crore.

Also See:

India, Japan to sign MoU for freight corridor by August (24-Jul-07)

← All latest storiesBack to top →