Financial Performance in 2002-03
Special Railway
Safety Fund (SRSF) - Financial & Physical progress
Introduction
At the outset, I express my profound gratitude to
Honourable Prime Minister for launching the National Rail Vikas Yojana, which
involves the strengthening of the Golden Quadrilateral, augmenting rail connectivity
to ports and also the construction of four mega bridges.
This non-budgetary initiative is bound to accelerate
the growth of the Indian Railways, which is the life line of the nation.
Review of
Financial Performance in 2002-03
In the Budget for 2002-03, the originating revenue
earning freight traffic has been estimated at 510 million tonnes. I am happy to
inform the House that the performance during the first 10 months of the current
fiscal has exceeded the proportionate target.
Accordingly, the target for the originating revenue
earning freight traffic has been revised upwards to 515 million tonnes in the
Revised Estimates for the year. On the other hand, in the Passenger segment
there has been a drop of nearly three per cent in number of passengers to end
December 2002.
The goods earnings are likely to exceed the Budget
target of Rs.26,118 crore by Rs.540 crore, whereas passenger earnings are
likely to fall short of the Budget target of Rs.13450 crore by Rs.720
crore.
Taken together, the other coaching and sundry earnings
are likely to be Rs.24 crore below the Budget target. Due to continued increase
in the amount owed to Railways by the users, particularly, Electricity Boards,
the unrealised earnings are likely to increase by Rs.417 crore as against a
budgeted clearance of Rs.50 crore. Therefore, the budgeted Gross Traffic
Receipts of Rs.41,538 crore have been reduced to Rs.40,867 crore in the
revised estimates.
With sustained monitoring and continued austerity,
there is likely to be a reduction of Rs.850 crore in the ordinary working
expenses. Accordingly, the revised estimates for these are placed at Rs.30,310
crore as against Rs.31,160 crore in the Budget estimates.
The operating ratio budgeted at 94.4 per cent is
likely to improve to 92.5 per cent in the revised estimates.
Besides discharging fully the dividend liability for
the year, an amount of Rs.50 crore is also proposed to be cleared from the
Deferred Dividend Liability Account.
Continuous
Track Circuiting
Continuous track circuiting enables detection of
discontinuities caused by rail/weld fracture or acts of sabotage. This helps in
taking timely precautionary measures and prevents possible accidents. This will
also improve the line capacity and safety at level crossing gates. The work of
track circuiting is being executed within station limits. Work of continuous
track circuiting in block sections on selected sections of A, B and C routes at
a cost of Rs.425 crore is now being proposed in this Budget.
Bridges
For upgrading and modernizing the bridge inspection
and management systems, action has been taken to initiate underwater
inspections, computerized non-destructive testing with state-of-the-art
equipment and introduce a modern Bridge Management System.
Crash
worthiness of Coaches
To minimise injuries during rail travel, coaches are
being redesigned without any sharp corners in the interior and duly padding up
vulnerable areas. In order to prevent coaches from climbing over each other in
the event of a collision, tight lock couplers are being introduced
progressively.
Concurrently, redesigning coach ends to take the full
impact of the collision has been undertaken so that passenger areas remain free
from damage due to collision or heavy impact.
Special Railway Safety Fund (SRSF) -
Financial & Physical progress
During 2001-2002 the actual expenditure under SRSF
stood at Rs.1434 crore (Net) as against the allotment of Rs.1400 crore.
The safety surcharge fell short of the targeted
collection by Rs.95 crore. Thus, the additional amount of Rs.129 crore required
on both these counts was made available through Railways normal revenues. In
the current year, the total net allocation for SRSF was stepped up to Rs.2210
crore as per the Budget Estimates, which included Rs.1350 crore as contribution
from the general exchequer and Rs.860 crore from the safety surcharge.
This has been further increased by Rs.100
crore in the revised estimates to keep up the pace of progress of safety
works under SRSF. Railways are contributing this additional amount as well as
the current years shortfall of about Rs.200 crore in surcharge collection from
its own revenues.
As regards the physical progress of the works, I would
like to inform that track Renewal of around 5,400 km is also expected to be
completed by the end of the current year.
Rehabilitation of approximately 745 bridges is likely
to be completed by the end of the current financial year. So far signalling
equipment replacement works have been completed at 298 stations. Further, about
1350 track circuits have been provided till now.
Other Initiatives
Joint Venture with NTPC
As was reported last year, an MoU was signed by the ministry of railways
with NTPC for setting up of captive thermal power plants. I am happy to state
that the project committee consisting of representatives from NTPC and Railways
formed for the purpose has, after examining four different sites, recommended
Nabinagar as a suitable site for a 1000 MW thermal plant, which has been
accepted. It is now proposed to form a Joint Venture Company of Railways with
NTPC for implementation of the scheme.
Bio Diesel
The Railways are also exploring alternative fuel
sources. A massive drive for planting Ratan Jyot plants on both sides of the
Railway land has been embarked upon. Bio-diesel, which can be distilled from
Ratan Jyot by a simple and inexpensive refining process, can be freely mixed
with diesel oil used on our locomotives. This is an initiative that is not only
environment-friendly, but will also result in reducing our fuel bill.
Projects
National
Rail Vikas Yojana
National Rail Vikas Yojana, announced on 15th August,
2002, at an estimated cost of Rs.15,000 crore, has been formally launched on
26th December, 2002 by the Honble Prime Minister. A company named "Rail Vikas
Nigam Limited" has been incorporated under the Companies Act for
implementation of these projects including raising of resources.
Strengthening of the Golden Quadrilateral and its
diagonals through identified sub-projects costing about Rs.8,000 crore (Rs.80
billion) will form the major part of this yojana. A part loan of $ 313.6
million has been approved by ADB. It will be utilized, mainly, for execution of
projects covered under the initiative of "strengthening of Golden
Quadrilateral". A dialogue with World Bank has been initiated to mobilize
funds for "mega bridges" and other NRVY projects. Projects under the
initiative "port connectivity" have been identified and resource
mobilisation for the same is proposed to be organized through various public-private
partnership initiatives and budgetary support.
Sir, as committed in my last budget speech, work has
already commenced on three mega bridges i.e., Bogibeel bridge over river
Brahmaputra, two bridges over river Ganga, one at Patna and the other at Munger.
I am happy to inform the House that the requisite clearances for the mega
bridge over river Kosi have been obtained and the work has been included in the
Budget.
National
and strategic projects
Honourable Prime Minister, during his visit to
Srinagar had announced that the first train will roll into Kashmir Valley by
15th August 2007. I express my gratitude to the Hon'ble Finance Minister, who
has provided Rs.. 500 crore for this National project in 2003-04, considering
its importance.
The work on Udhampur-Katra and Quazigund-Baramulla
sections is already in progress.
The stretch between Katra-Quazigund is very difficult
requiring large scale tunneling and bridging works for which detailed surveys
on ground need to be carried out. Considering the arduous nature of work,
construction on this section has been entrusted to two technically sound
organizations, viz., IRCON and Konkan Railway Corporation Limited while
detailed survey has been entrusted to RITES. I am happy to inform that long
pending project of Jammu-Udhampur is progressing at a satisfactory pace and is
targeted for completion by March 2004. Further, rail link up to Katra is likely
to be completed during 2004-2005.
The two strategic projects, namely, gauge Conversion
from Luni to Munabao and new line between Kolayat and Phalodi are progressing
satisfactorily and gauge Conversion up to Samdari has already been completed.
Over 1300 km of BG lines are likely to be added during
the current year. Further, a target of addition of nearly 1340 kms of BG lines
has been set for 2003-2004.
New Lines
Sir, I am happy to state that Kumarghat-Manu of
Kumarghat-Agartala new line has already been completed and commissioned on
27.12.2002 for passenger services. The restoration of Fatuha-Islampur has also
been completed. It is hoped to complete restoration of Duraundha-Maharajganj
and new lines between Katra-Faizabad and Joruli-Keonjhar during the year.
Further, the work of Daulatpur-Malikpur and Bajkul-Nachenda are also likely to
be completed by March 2003. The balance targeted portion of these lines i.e.
from Malikpur to Balurghat and Nachenda to Kanthi are expected to be completed
by June 2003.
In 2003-2004, Railways propose to complete 225 km of
new lines including following sections:
- Panvel-Karjat
- Sasaram-Nokha of
Ara-Sasaram
- Kakdweep-Namkhana of
Lakshmikantapur-Namkhana
- Bajalta-Udhampur of
Jammu-Udhampur
- Una-Churaru Takrala of
Nangaldam-Talwara
- Kakinada-Kotipalli
restoration
- Mahendralalnagar-Amta
of Howrah-Amta
- Hassan-Sharavanabelagola
of Hassan-Bangalore
- Tilaiya-Jagdishpur of
Rajgir-Tilaiya
Gauge Conversion
During the
year, the gauge Conversion of Vadalur-Vriddhachalam, Dharmabad-Nizamabad and
Jankampet-Bodhan has already been completed. I am happy to state that against
the original target of 791 km of gauge Conversion set for the current year,
nearly 900 km of gauge Conversion is likely to be achieved. This includes
Latur-Latur Road new line portion of Miraj-Latur, Mangalore-Kabakaputtur,
Virudunagar-Rajapalaiyam, Katpadi-Pakala-Tirupati, Surendernagar-Pipavav,
Rajkot-Junagarh and Samdari-Jasai where the works of mega block are already in
progress.
During the
year 2003-2004, a target of over 775 km of gauge Conversion has been proposed
which include the following sections:
- New Jalpaiguri /
Siliguri-Samuktala of New Jalpaiguri-New Bongaigaon
- Bandikui-Bharatpur of
Bandikui -Agra
- Jasai-Munabao of
Luni-Munabao
- Kabakaputtur-Subrahmanya
Road of Hassan-Mangalore
- Villupuram-Pondicherry
- Rajaalaiyam-Tenkasi of
Quilon-Tiruchendur and Virudunagar-Tenkasi
- Vadalur-Cuddalore of
Salem-Cuddalore
- Thanjavur-Kumbakonam of
Thanjavur-Villupuram
- Gondia-Balaghat of
Jabalpur-Gondia
- Junagarh-Veraval with
extension to Somnath of Rajkot-Veraval
- Dhola-Bhavnagar
Further, I
am happy to announce that the works of Bhind-Etawah new line as part of
Guna-Etawah and Mansi-Saharsa gauge Conversion are in good progress and likely
to be completed during the year 2004.
Doubling
During the
current year about 200 km of doublings are likely to be completed, while in the
next financial year a target of 340 km has been proposed.
Hon'ble
MembeRs.will be happy to know that doublings of Pakni-Mohol, Mansi-Maheshkhunt,
Rohtak-Jakhal, Hapur-Kankather, Sahibabad-Anand Vihar 3rd and 4th
line, Ambaturai-Kodaikkanal, Chennai Beach-Korukkupet, Kataiya Dandi-Lohgara,
Shujalpur-Akodia, Barauni-Tilrath, Barharwa-Tinpahar, Kayankulam-Cheppad and
Kayankulam-Mavelikara, Jahanabad-Bela and Chandpara-Bangaon have been included
in the budget. Further, doubling of Raichur-Guntakal, Cuttack-Barang,
Khurda-Barang 3rd line and Aligarh-Ghaziabad 3rd line
have also been included to strengthen Golden Quadrilateral. The completion of
these works is expected to ease the traffic flow and create additional capacity
on some of the saturated sections.
Mega Terminals
While there
have been persistent demands for introducing new trains from the Metros,
terminal constraints are a major bottleneck. To overcome this, proposals for
development of additional terminals at Chitpur, Kolkata and Anand Vihar, Delhi
have been included in this Budget.
Suburban Transport Projects
I am happy
to state that necessary approvals for the Mumbai Urban Transport Project –
Phase-I have been obtained. The project envisages upgradation of the rail
infrastructure in the city of Mumbai and will go a long way in reducing the
overcrowding of commuteRs.in the Mumbai Suburban Rail System. The project
involves a loan component of Rs..1613 crore, which has been sanctioned by the
World Bank. The work is expected to be completed in 5 years.
I am glad
to inform the House that the work on the balance portion of 5th line from
Andheri to Borivali has been completed. The work of automatic block signalling
from Virar to Dahanu Road has also been completed, enhancing the line capacity
of the section.
EMU
services on Barasat-Hasnabad have been commissioned on 22.12.2002. The
extension of Kolkata Metro from Tollyganj to Garia is progressing
satisfactorily. Extension of Circular Railway from Princepghat to Majerhat and
its connection to Netaji Subhash Chandra Bose Airport is likely to be completed
by December 2004.
I am happy
to state that gauge Conversion of Chennai Beach to Egmore has been commissioned
recently. The section from Tambaram to Chengalpattu is likely to be completed
by March-2004.
Hon'ble
MembeRs.would be pleased to know that considering the public need, it has been
decided to provide a direct link between Chennai Central and Chennai Egmore.
This link would benefit commuteRs.as well as long distance passengeRs.and would
relieve them of the irksome transhipment between the two stations. As regards
MRTS, the work of Tirumailai to Vellachery is expected to be completed by June
2003.
The multi-modal
transportation system for the twin cities of Hyderabad and Secunderabad, is
making satisfactory progress and upgradation of railway infrastructure in
Hyderabad-Secunderabad-Falaknuma section and Hyderabad-Lingampalli sections is
likely to be completed by March 2003.
There have
been demands of beautification of the stations on circular railway at Kolkata
in order to improve overall ambience along the bank of river Hoogly. I am happy
to inform that it is proposed to give face-lift to the stations along with
plantation and ornamental fencing in between the stations so as to bring about
overall improvement in the surroundings.
Railway Electrification
Railway
Electrification works have progressed satisfactorily during the year and 208 route
kms. have been energized up to January, 2003. It is proposed to electrify a
total of 375 route kms. during the current year. By the end of March 2003,
16376 route kms (25.98 percent) on Indian Railways will be electrified.
Annual Plan 2003-2004
Sir, I
would now like to present the Annual Plan 2003-2004. The Plan outlay for
2003-2004 has been kept at Rs..10,607 crore. Taking into account the outlay of
Rs.2,311 crore on safety related works through the Special Railway Safety
Fund (SRSF), the total outlay comes to Rs.12,918 crore. This is Rs.603
crore higher than the Revised Estimates of last year. For the year
2003-2004, the total funds received from General Exchequer are Rs.6,577 crore,
including Rs.1,600 crore as contribution towards the SRSF and Rs.433
crore from the Central Road Fund. This also includes Rs.730
crore specifically for investment in the newly created Rail Vikas Nigam.
The corresponding figure for 2002-2003 was Rs.5,840 crore, including Rs.1,350
crore for the SRSF and Rs.450 crore from the Central Road Fund.
In addition
to the budgetary support, Railways propose to provide Rs.2,630 crore for
plan expenditure through internal resource generation. This is at the same
level as was budgeted for last year. The balance requirements of the Plan would
be met through extra-budgetary resources, which include Rs.2,970 crore as
market borrowing from Indian Railways Finance Corporation and Rs.30 crore as
investment through a "BOT" project in the Viramgam-Mehsana Gauge
Conversion work. For the Special Railway Safety Fund, the contribution of the
Central Government would be supplemented to the extent of Rs.711
crore through Safety Surcharge, taking the total outlay under SRSF to
Rs.2,311 crore.
Sir, the
total outlay under capital on the five major plan project heads this year has
been kept at Rs.2,716 crore with Rs.1,005 crore on New Lines, Rs.703
crore on Gauge Conversion, Rs.443 crore for Doubling and Rs.122 crore
for Electrification. The outlay on metropolitan transport projects, which has
been kept at Rs.443 crore, includes multi-lateral funding for the Mumbai Urban
Transport Project.
Apart from
this, Rs.730 crore are being allotted to several works in the planheads
New Lines, Doubling, Gauge Conversion and Railway Electrification, which are to
be executed by the Rail Vikas Nigam.
The outlay
on safety related planheads, inclusive of outlay given under the Special
Railway Safety Fund, is Rs.2605 crore (Rs.26.05 bn) for track renewals,
Rs.302 crore (Rs.3.02 bn) for the bridges and Rs.689 crore (Rs.6.89
bn) for signalling & telecommunications.
Budget Estimates: 2003-04
The
Railways are expecting to carry 540 million tonnes of revenue earnings
originating traffic during 2003-2004, which is 25 million tonnes more than the
traffic of 515 million tonnes likely to be lifted in the current year and this
increase is higher than the average incremental freight achieved in the last
few years. However, taking note of the prevailing trend in the economy and the
various measures being taken by the Railways, this target is expected to be
achieved. The originating passenger traffic is estimated to go up by about 3
per cent resulting in increase in earnings of 7 per cent over the Revised
Estimates of the current year. The 'Other Coaching' earnings are expected to grow
by 7 per cent. Sundry Other Earnings, for 2003-2004 have been estimated at
Rs.990 crore, representing a growth rate of 5 per cent over the Revised
Estimates of the current year.
On the
basis of these assumptions, the Gross Traffic Receipts (GTR) are estimated at
Rs.43,495 crore. These are Rs.2,628 crore higher than the Revised
Estimates of the current financial year.
Railways'
Ordinary Working Expenses estimated at Rs.32,460 crore are 7 per cent
higher than the Revised Estimates of the current year. Appropriation to Pension
Fund is placed at Rs.6,385 crore. Based upon the anticipated requirement for
plan resources, a provision of Rs.. 2005 crore has been made towards
Appropriation to Depreciation Reserve Fund .
The total
Working Expenses will, thus, amount to Rs.40,850 crore leading to the Net
Traffic Receipts of Rs.2,645 crore. Net Miscellaneous Receipts are estimated at
Rs.888 crore, which also take into account the amount likely to be collected
through levy of surcharge on passenger fares for being appropriated to the
Special Railway Safety Fund. Thus, the Net Revenue works out to Rs.3,533 crore.
A
memorandum on the rate of dividend payable to General Revenues has been
submitted to the Railway Convention Committee. Meanwhile, dividend for 2003-2004,
has been provided at the same rate as adopted for 2002-2003. On this basis,
dividend liability for 2003-2004 works out to Rs.2,930 crore. Along with
certain other dues, an amount of Rs.2,978 crore becomes payable to the
General Revenues. This liability will be discharged in full.
The above
projections are expected to yield funds sufficient to meet the requirement of
the Plan outlay for the year, from the internal resources.
With a view
to make the Freight rates and Passenger fares competitive and increase
Railways' share in transport sector, it is necessary to continue the process of
rationalisation and re-balancing of Tariffs. In order to attract more traffic
to rail, I am proposing certain other measures and reforms.
Freight Services
Sir, for
year 2002-2003 I did not make any across-the-board increase in freight rates.
For the year 2003-2004, I do not propose any increase in freight rates for any
commodity.
While
rationalising the freight structure, the total number of classes was reduced
from 59 to 32 with Class-90 as the lowest class and Class-300 as the highest
class. In freight structure so rationalised, the ratio between the highest and
the lowest freight rate was reduced from 8.0 to 3.3. It is proposed to reduce
further the band of freight rates through compaction in freight classification
by lowering the highest class from Class-300 to Class-250. In the revised
classification, the total number of classes will be reduced from 32 to 27 and
the ratio between the freight rates for the highest and the lowest class will
be further reduced from 3.3 to 2.8.
To make the
freight rates competitive, it is proposed to reduce the classification of
certain commodities where Railways are facing stiff competition due to high
freight rates. The classification of Petrol for trainload movement is proposed
to be reduced by three stages from Class-280 to Class-250, lowering the freight
rates by 10.7 per cent. The classification of certain other commodities is
proposed to be reduced by two stages. These commodities include High Speed
Diesel Oil (HSD), Furnace Oil, Crude Oil, Naptha, Liquefied Petroleum Gas
(LPG), Compressed Gases, Lubricating Oils, Iron & Steel, Pig Iron, Iron
Scrap, Cement sheets, Petroleum Coke and Soda ash. Some of the liquid commodities,
carried in tank wagons, namely Molasses, Bitumen, Refined vegetable oils (Div.
A), and Sulphuric acid are also proposed to be charged two stages lower than
their existing classes. The proposed reduction in freight rates due to lowering
of classification by two stages will range from 5.3 per cent to 9.5 per cent.
The classification of Cement, Clinker, Manganese Ore and Caustic Soda Liquid
(in tank wagon) are proposed to be reduced by one stage, which will reduce the
freight rates by around 3.7 per cent. Details of the re-classification of these
commodities, along with the existing and proposed freight rates for selected
distances, are given in the Memorandum Explaining the Budget Proposals for
Adjustment in Freight Rates and Fares.
In order to
increase its share in transportation of Petroleum products, Railways are ready
to consider long- term agreements with individual oil companies for further
reduction in freight rates on sector-to-sector basis if guaranteed volumes of
additional traffic are committed for rail movement.
There are
many commodities, which have a wagonload class only. It has been decided that
any commodity, which has only a wagonload class, will be assigned a trainload
class one stage lower than its wagonload class. As a result, the freight will
get reduced by around 4.00 per cent to 5.26 per cent if such a commodity is now
offered for trainload booking.
Freight
movement on the Indian Railways is predominantly in the form of block rakes
from one originating station to a single destination point. However, with a
view to reduce the carrying cost of the customers , block rake movement from
one originating station to two destination points close to each other and
vice-a-versa is also being permitted. At present, such two-point block rakes enjoy
the benefit of lower trainload rates only up to the common point of movement.
It has been decided that two-point block rakes will now be granted the benefit
of trainload rate for the entire distance of transportation.
At present,
clubbing up to six consignments is permitted in a broad gauge 8-wheeler wagon.
In order to provide rail transportation to a larger number of traders and
retailers, it has been decided to allow clubbing up to twelve consignments, on
payment of Rs.100 for every additional Railway Receipt.
The wages
of the railway staff deployed in private sidings are being traditionally
charged to the siding owners. In order to give relief to the siding owners,
Zonal Railways will undertake a thorough review to reduce the cost of railway
staff being charged to the private siding owners in a phased manner.
Siding
owners generating freight earnings of more than Rs.25 crore (Rs.250
million) per annum from traffic originating from their sidings have been
designated as Premier Customers of the railways. An incentive scheme for the
Premier Customers to help them increase the rail share of transport is being
introduced. Premier Customers would be granted a freight rebate of 2 per cent
for every five crore rupees of net additional originating freight earnings over
the previous financial year generated to the railways. The rebate under this
scheme will be granted in addition to any other freight concession availed by
them. However, this incentive scheme will be applicable to net additional
originating freight earnings from commodities placed in Class-135 and above.