Illustrative image – not actual.Bids have been invited by Rail Vikas Nigam for construction of formation, bridges, buildings, and two level crossings on existing tracks between Barkhera and Budni stations in Madhya Pradesh.
The scope of work involves construction of formation, bridges, buildings, two level crossings on existing tracks, supply of ballast along with associated signalling and general electrical works in connection with construction of roadbed (except tunnels) for electrified third BG railway line between Barkhera (excluding) and Budni (excluding) stations (26.5 km) on Bhopal-Itarsi section in Bhopal division of West Central Railway in Madhya Pradesh.
The project will entail an investment of Rs 505.67 crore and will be executed in 36 months.
