Illustrative image – not actual.
The Rail Vikas Nigam (RVNL) has invited bids for construction of double line ballast less track in connection with metro railway corridor.
The scope of work involves construction of double line ballast less track for elevated viaduct portion between Nicco Park having ch (13,841.585 mtr) to Titumir ch (25,891.527 mtr) including points and crossings, etc. in connection with construction of metro railway corridor from New Garia to Airport Corridor in the city of Kolkata in West Bengal.
The work will entail an investment of Rs 130.49 crore to be completed in 24 months.
