Rail Vikas Nigam floats tender for Newgaria-Bimanbandar Metro CorridorIllustrative image – not actual.

Rail Vigas Nigam has floated tender for works at Newgaria-Bimanbandar Metro Corridor of Kolkata Metro Railway Line in West Bengal.

The scope of work envisages construction of viaduct, ramp and underground RCC box (cut and cover, box pushing) including related works for 3.520 km length from ch 25,891.527 to ch 29,410.989 between existing pier CP-760 (near City Centre-II) to merging point with Metro railway at Biman Bandar Station Yard including two stations (Rabindra Tirtha and VIP road) with all allied works (architectural, electrical, mechanical, heating, ventilation, air conditioning, fire detection, fire suppression system and public health engineering works) in Newgaria-Bimanbandar Metro Corridor.

The works will be completed in a period of 36 months at a cost of Rs 526.62 crore.

 

← All latest storiesBack to top →