Illustrative image – not actual.
The Bengaluru Railway Division of Indian Railways plans to establish a terminal in Devanahalli with the objective to ease congestion in key railway stations across the city. The project will be developed at an estimated cost of Rs 2,500 crore.
The proposed terminal will span 200 acres, boasting a minimum of 10 platforms dedicated to train operations, and will be equipped with maintenance facilities. The project aims to alleviate the burden on saturated stations like KSR Bengaluru, Yeshwanthpur and Bengaluru Cantonment. For this, a site situated four to five km away from the existing Devanahalli Halt station is likely to be considered.
Moreover, the terminal’s integration into the 287-km circular railway project for Bengaluru is part of the vision, and feasibility studies are currently underway. Unveiled by Railway Minister Ashwini Vaishnaw in November last year, the initiative aims to streamline connectivity by linking Nidvanda, Doddaballapur, Devanahalli, Malur, Heelalige, and Solur, ultimately circling back to Nidvanda.
The circular railway project will also synergise with the Bengaluru Suburban Rail Project (BSRP) and Namma Metro. Upon completion, seamless train transfers to the Devanahalli terminal are anticipated.
