Rail network at Ennore Port plannedIllustrative image – not actual.

Ennore Port plans to have a 80 km rail network bypassing the Trivallur – Chennai section for aiding iron ore exporters. The rail line, likely to cost Rs.170 crore, would start at Puttur and reach Athipattu near the port. The survey for the proposed line has been completed and the line is expected to reduce the distance by 35 km. This would result in savings on freight to iron ore exporters who export iron ore from Bellary – Hospet region in Karnataka. The project is still in preliminary stages.

 

The port was planning to award the contract for buiding an iron ore berth capable of handling 12 million tonnes by July 2003. Also the dredging work, costing Rs.195 crore, for increasing the draft to 18 m is expected to begin soon. Contract for coal terminal and marine liquid cargo terminal is to be awarded on BOT basis by July 2003. All the berths – coal, marine liquid and iron ore – are likely to be completed by July 2005.

← All latest storiesBack to top →