R-Infra’s Haryana road project commences operationsIllustrative image – not actual.

GF Toll Road, a SPV of Reliance Infrastructure (R-Infra) has begun operations of its Rs 800 crore widening of Gurgaon-Faridabad-Ballabhgarh-Sohna road Haryana.

The project is R-Infra SPV’s first state road project, executed on BOT and has a concession period of 17 years, during which time the road will be operated and maintained by R-Infra’s SPV. The project involved four laning of Gurgaon-Faridabad stretch and two laning of Ballabhgarh-Sohna road. The project includes 14 lanes toll plaza at Gurgaon Faridabad road and six lanes toll plaza at crusher zone. Also, two toll plazas of six lanes each are located on Ballabhgarh Sohna stretch.
 
Related Links:
Project profile
← All latest storiesBack to top →