Illustrative image – not actual.Reliance Infrastructure (R-Infra) on 2 May 2011 commissioned the second power line of its 1,500-km Western Region System Strengthening Scheme.
The 103-km line was laid at a cost of Rs 1,400-crore. The project, which has a concession period of 25 years, will connect Gujarat to Maharashtra, cutting across the industrial belts of Ahmedabad, Surendranagar and Mehsana. The project will facilitate the flow of 4,000 MW power.
Related Links:
Project profile
