Illustrative image – not actual.Mumbai’s first cable-stayed rail overbridge (ROB) may come up at Mahalaxmi.
The proposed project worth Rs 80-90 crore may start from the lane parallel to New Shirin Talkies at Jacob Circle (Saat Rasta) to Dr E Moses road near the racecourse. The bridge will then be expanded for construction of the four-lane bridge.
The project is currently awaiting sanction from railway officials. Another proposed ROB to come up on the other side of the railway station is in the nascent stage.
