Illustrative image – not actual.The Government is likely to cut the time given for conducting the feasibility study for the Sethusamudram ship canal project in Tamil Nadu from two years to six months.
The Union Minister for Shipping, Mr Vedprakash P.
Gopal has stated that the time of two years as stipulated in the tender was too
long and that he would like to see the report ready within six months.
Tuticorin Port Trust, the nodal agency appointed for the
project, had floated global tenders to select consultants, for preparing the feasibility
study of the project, in September 2001.
The study, which is estimated to cost Rs.4.5 crore,
is to be done in two parts. The first part of the study would to focus on the techno-economic
viability of the Sethusamudram ship canal linking Palk Bay and the Gulf of
Mannar on the east coast by creating a shipping canal through the Rameswaram
Island, while the second part would concern a detailed environment impact
assessment of the project.
The project involves widening and deepening of the Pamban
channel to facilitate the movement of coastal ships of the size of 3,000
tonnes.
Related News:
TPT invites tenders
for Sethusamudram canal project
