Priority section of Delhi-Meerut RRTS to be commissioned by 2023Illustrative image – not actual.
The 17 km priority section of the Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) corridor will be commissioned by 2023.  
 
The Regional Rapid Transit System (RRTS) is an 80 km long corridor connecting Delhi and Ghaziabad and Meerut in Uttar Pradesh. 
 
The priority section including Sahibabad, Ghaziabad, Guldhar, Duhai and Duhai Depot. The full corridor is expected to be commissioned by 2025. 
 
The corridor will have 25 stations in total. Trains on the stretch will run at a speed of 180 km per hour. The distance between Delhi and Meerut will be covered in 55 minutes.
← All latest storiesBack to top →