Illustrative image – not actual.Pranab Mukherjee, President of India, will inaugurate 363 MW Unit-I of Tripura power project, on 21 June 2013.
The Rs 3,429 crore project has been built by ONGC through a special purpose vehicle -- ONGC Tripura Power Company (OTPC), with an installed capacity of 726 MW (2X363 MW). The Unit-I, 363 MW gas based power unit of the project has been synchronised in October 2012 and has started generating electricity.
Unit-II of the project is expected to commence operation in August 2013.
Power generated at the plant will be evacuated through a 400 kV Transmission system connecting Palatana in Tripura to Bongaigaon in Assam over a distance of around 650 km.
Addendum: On 21 June 2013, Pranab Mukherjee, President of India, inaugurated 363 MW Unit-I of Tripura power project
Related Link:
Project profile
