Premier Energies and RCT to set up BESS manufacturing JVIllustrative image – not actual.

Solar manufacturer Premier Energies and German renewable energy technology group RCT have agreed to establish a joint venture (JV) in India.

The JV is for a battery energy storage system (BESS) manufacturing, with a planned total capacity of 12 GWh. For the venture, Premier Energies’ subsidiary Premier Battery Technologies (PBTPL) and RCT Energy India have signed a binding term sheet dated 10 September, 2026. The proposed joint entity, Premier Energies Storage Solutions (PESSPL), will develop the manufacturing facility in Telangana. The project will be implemented in phases. The overall joint venture is expected to eventually reach the proposed 12 GWh capacity. The project will strengthen domestic manufacturing capabilities for battery storage systems and support the integration of renewable energy in the power network.

The partnership is aimed at serving India’s growing energy storage segment across commercial, industrial and utility-scale applications.

← All latest storiesBack to top →