Illustrative image – not actual.
Rail Vikas Nigam (RVNL) has invited pre-qualification for development of railways and related infrastructure in two contract packages.
The contract packages are as follows:
-
Construction of third line between Jimdipeta (Incl)-Vizianagaram (Incl) section (length 109 km) on East Coast Railway, on EPC basis. The estimated cost of the project is Rs 700 crore.
-
Construction of third line between Balugaon (Excl)-Palasa (Incl) section (length 150 km) on East Coast Railway, on EPC basis. The estimated cost of the project is Rs 735 crore.
