Illustrative image – not actual.Pipavav Railway Corporation (PRCL), the
first private sector initiative in the railways sector, has completed the 271 km
Surendranagar-Pipavav railway line project in 18 months. This involves gauge conversion
for a distance of 250 km (Surendranagar to Rajula) and construction of a new
line of 21 km broad gauge link between Rajula and Pipavav. The entire stretch has 22 railway stations en
route.
PRCL, a joint venture between the
Ministry of Railways and Gujarat Pipavav Port Ltd, completed the project with a
capital outlay of Rs.373 crore.
PRCL has the right to develop, operate
and maintain the Surendranagar-Pipavav railway line on a build, own, operate
and transfer basis for 33 years, under a concession agreement with the Ministry
of Railways. According to the memorandum of understanding, the operation and
maintenance cost would be paid by PRCL to the railways on a yearly basis.
Indian Railways, it is reported, is
planning to develop various projects in Karnataka, Andhra Pradesh and
Chattisgarh on the lines of the Gujarat venture.
