Prayagraj to integrate ropeway project into Metro DPRIllustrative image – not actual.

The Prayagraj Development Authority (PDA) has decided to integrate the city’s upcoming ropeway project into the Metro detailed project report (DPR) to create a seamless connection between the two mass transit systems.

The revised plan aims to develop a common interchange station at Parade, allowing passengers to switch between the Metro and ropeway without exiting the station premises. PDA has instructed RITES, the railway consultancy firm preparing the Metro DPR, to include the ropeway component and submit the updated report by August 15. After technical evaluation, the DPR will be forwarded to the Uttar Pradesh government for approval. According to officials, both Metro and ropeway facilities will be developed within the same complex at Parade, which is planned as the central interchange point of the city’s proposed transport network. The Metro project includes a 44-kilometre network with two corridors intersecting at Parade.

The ropeway project is planned to connect Parade with Arail across the Yamuna, providing quicker access to the Sangam area and reducing traffic congestion during major religious events such as Kumbh and Magh Mela.

← All latest storiesBack to top →