Illustrative image – not actual.The Union Ministry of Power has decided in principle to allot power from the Tala Hydro Electric power project in Bhutan to the eastern region in India. Earlier, the ministry had decided to allot the same to the northern region. The Eastern Region Electricity Borad (EREB) had opposed this decision since July 2000.
However, the ministry has laid the condition that, the eastern region should absorb all the power generated by the Tala project and ensure that it exports a part of it to the power-deficit northern region. The eastern region was also asked to indicate the source of power from where it would be transported to the northern region.
The power from the Tala project would flow from the site of the project to Moinaguri near Siliguri in West Bengal to Muzzaffarour in Bihar. This line would be extended to Gorakhpur in Uttar Pradesh, through which power could be transported to the northern region.
The Tala project is being implemented with financial and technical assistance from India. The project is expected to be completed by 2003.
Another project in Bhutan – 360 MW Chukha power project – has also set up with financial and technical aid from Inida. Presently, 300 MW of the power from this project is absorbed by India.
