Illustrative image – not actual.The Power Grid Corporation of India (PGCIL) has floated tender for diversion of transmission line.
The scope of work envisages tower package TW01 for diversion of various existing 400 kV and 200 kV transmission lines of POWERGRID due to fouling in proposed corridor of high speed bullet train project of the National High Speed Rail Corporation in Maharashtra and Gujarat under consultancy services to NHSRCL.
