PMRDA awaits Rs 2,000 cr from Centre for Ring Road projectIllustrative image – not actual.

The Pune Metropolitan Region Development Authority (PMRDA) is awaiting the Union government to disburse Rs 2,468 crore to acquire land for Phase-I of the proposed 129 km ring road in Maharashtra.

 

The money will be disbursed by the Central government under the Bharatmala Pariyojana. PMRDA has so far acquired only 24 percent of the land for the 12 km of Phase-I of the project which will connect the Satara highway to the Ahmednagar highway. Work for the 32 km ring road in Phase-I is pending because of the delay in land acquisition.

As part of the project, the Centre had kept the ring roads of Pune and Bengaluru on the priority list. The ring road is likely to ensure better connectivity to highways and reduce the ordeal of travelling through congested interiors of Pune and Pimpri Chinchwad.

The total cost of the 129 km Ring Road, linking three highways around Pune and Pimpri Chinchwad, is expected to be a little more than Rs 17,000 crore. Of this, Rs 12,000 crore is expected to be funded under the Bharatmala Pariyojana.

The rest of the funds will be generated through town planning schemes and land monetisation models. Land has so far been acquired in Kadambavasti, Wagholi and Vadachiwadi area for Phase-I of the project. The work can resume only after the remaining 76 percent of land is acquired with the Central allocations.

← All latest storiesBack to top →