Illustrative image – not actual.On 29 April, 2026, Prime Minister Narendra Modi inaugurated the 594-km Ganga Expressway in Hardoi, a Rs 36,230 crore greenfield infrastructure project aimed at transforming connectivity across Uttar Pradesh.
The six-lane, access-controlled expressway (expandable to eight lanes) links Meerut in western UP with Prayagraj in the east, forming a high-speed transport corridor across key economic regions. According to official estimates, it will significantly reduce travel time between Meerut and Prayagraj from 10–12 hours to around six hours, improving passenger movement and freight efficiency.
The expressway passes through 12 districts, including Meerut, Bulandshahr, Hapur, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh and Prayagraj, strengthening intra-state connectivity. A notable feature is a 3.5-km emergency landing strip in Shahjahanpur designed for dual civilian and defence use. The project also includes planned manufacturing and logistics hubs across 2,635 hectares, expected to reduce logistics costs and boost industrial competitiveness.
It is expected to benefit agriculture by improving access to urban and export markets, enhancing farmer income. Tourism and employment opportunities are also likely to rise. The expressway integrates with other major corridors like Agra-Lucknow, Jewar Link and Farrukhabad Link Expressways, creating a broader state-wide transport network and supporting long-term economic growth in Uttar Pradesh.
