PM launches hydel power initiativeIllustrative image – not actual.

Prime Minister, Mr Atal Bihari Vajpayee, will be launching a major hydel-power initiative today (24 May 2003.) Under the programme, a total of 50,000 MW of fresh hydel power generating capacity, through 162 projects, will be installed by the end of the Twelfth Five Year Plan (March 2017.)

 

The first phase of the initiative would involve preparation of pre-feasibility reports (PFRs) for the 162 hydel projects with a total capacity of 50,560 MW. These projects will be implemented in sixteen states as follows:

 

State

Capacity (MW)

Andhra Pradesh

705

Arunachal Pradesh

25,690

Chhattisgarh

580

Himachal Pradesh

3,750

Jammu & Kashmir

2,981

Karnataka

830

Kerala

205

Madhya Pradesh

60

Maharashtra

1,780

Manipur

407

Meghalaya

1,490

Mizoram

1,870

Nagaland

970

Orissa

1,188

Sikkim

1,680

Uttaranchal

6,374

Total

50,560

 

It might be recalled that the government is also contemplating setting up of a Central authority for hydel projects, on the lines of the National Highways Authority of India that is implementing the National Highways Development Programme.

 

The objective of the massive programme, estimated to cost Rs.2,25,000 crore (at current prices), is to have 40 per cent of the total installed power capacity in the form of hydel units. At present, India has a power generating capacity of 1,07,534 MW, out of which hydel units account for 26,660 MW (or 25 per cent.) Of this hydel power capacity, 3,049 MW is owned by Central utilities (mainly National Hydro-Electric Power Corporation), 22,935 MW by state-owned bodies and 676 MW by private sector enterprises.

 

It may be mentioned that during 2001-02, the Ministry of Power set a target of installing an additional power generation capacity of 1 lakh MW by the end of 2012.

 

← All latest storiesBack to top →