Illustrative image – not actual.
Prime Minister Narendra Modi inaugurated Kanpur Metro Rail Project on 28 December 2021. He inspected the Kanpur Metro Rail Project and undertook a metro ride from the IIT Metro Station to Geeta Nagar.
Before2014, the total length of the Metro running in the state was nine km. Between 2014 and 2017, the length of the metro increased to a total of 18 km. If we include Kanpur Metro, the length of the Metro in the state has now exceeded 90 km.
This completed nine km long section is from IIT Kanpur to Moti Jheel. The entire length of the Metro Rail Project in Kanpur is 32 km, and is being built at a cost of over Rs 11,000 crore.
He also inaugurated the Bina-Panki Multiproduct Pipeline Project. The pipeline extends from the Bina refinery in Madhya Pradesh to Panki in Kanpur and will help the region access petroleum products from the Bina refinery.
The 356 km long project has a capacity of around 3.45 million tpa. The project has been built at a cost of over Rs 1,500 crore. It will help the region access petroleum products from the Bina refiner.
