Phase-I of underground water project opensIllustrative image – not actual.

On 31 May, 2013, Uddhav Thackeray, President of Shiv Sena, inaugurated the underground water tunnel project in Mumbai, Maharashtra.


This 12.4 km long stretch from Marol Maroshi to Ruparel tunnel is 3.6 mtr in diameter, 70mtr deep and is divided into three sections - Maroshi to Vakola, Vakola to Mahim, and Mahim to Ruparel. Shafts, connected with the zonal supply network will connect the tunnels at Maroshi, Vakola, Mahim and Ruparel.


The estimated cost of the stretch is Rs 415 crore.

 

Related Link:
Project profile

 


 

← All latest storiesBack to top →