PGCIL signs MoU with Union Power MinistryIllustrative image – not actual.

Power Grid Corporation of India Limited (PGCIL) signed its ninth Memorandum of Understanding (MoU) with the Ministry of Power, setting various performance targets for the year 2001-02, on 10 April 2001.

 

The performance targets include availability of transmission system at 98.25 per cent, gross margin of Rs. 1,830 crore and execution of major transmission projects, which include Talcher-II transmission system, North-East HVDC Back-to-Back link, Tehri (800 kV) transmission system, Kolhapur-Mapusa, Kaiga-Narendra, Madurai-Thiruvananthapuram transmission systems and various Load Despatch and Communication schemes etc.

 

This year’s MoU also includes major thrust area diversification of PGCIL into telecom business and R&D activity, information technology, environment and social management and inventory management etc.

 

The MoU was signed between the Secretary Power, Shri A.K. Basu and the Chairman and Managing Director of PGCIL, Shri R.P. Singh.

 

PGCIL has been continuously achieving the excellent rating for the MoUs with the Ministry of Power in all facets of its performance encompassing operational, constructional and financial aspects etc. since its first MoU in the year 1993-94 and is the recipient of "Prime Minister’s MoU Award" for two consecutive years in 1997-98 and 1998-99.

← All latest storiesBack to top →